TITLE: 08/09 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 153Mpc
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY:
Relocking went Smoothly from this morning's Earthquake & lockloss. I was able to do a quick Initial_Alignment while the earthquake rang down.
Made it back to NLN at 16:30 observing at 16:33 UTC.
At 19:06:24 UTC I started a Calibration meaurement that had enough time to thermalize.
At 20:50:50 UTC an incoming earthquake was announced and at 20:58:01 UTC H1 was unlocked by the 5.9M Earthquake.
H1 Relocked just fine without any intervention from me.
NLN reached at 22:40:23 UTC
Observing Reached at 22:42:36 UTC
Handing off a Locked IFO to the Eve Shifter.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
19:33 | SAF | Laser HAZARD | LVEA | YES | LVEA is Laser HAZARD | 11:33 |
19:23 | Tour | Janos , Jennie, Elenna, Ryan S, Fred & Tours | Control Rm & Overpass. | N | Giving multiple tours | 21:09 |