WP 12749
Drawing D0902810-v11
Installation of the field cabling for the JAC tip/tilts completed. Cables pulled from the CER SUS-C3 rack to the SUS-R1 field rack. The DB25 cables going from the Sat Amp chassis were pulled to to the HAM1 D4 and D6 flanges.
F. Clara, M. Pirello, D. Sigg