oli.patane@LIGO.ORG - posted 16:36, Tuesday 12 August 2025 (86330)
Ops Day Shift End

TITLE: 08/12 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 143Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Currently Observing at 145 Mpc and have been Locked for 50 minutes. Relocking went pretty well today with the only concern being the fast shutter not firing during the last lockloss (86324), but luckily it seems like we were okay and that was expected in that situation.
LOG:

14:30UTC Locked for 5.5 hours and running magnetic injections
    14:40 Back into Observing
    14:45 Out of Observing for SUS charge measurements
14:57 Lockloss
19:18 Started relocking
    - Initial alignment - BS ADS convergence took 16+ minutes (86320)
20:47 NOMINAL_LOW_NOISE
    20:55 Observing
21:12 Lockloss
22:44 NOMINAL_LOW_NOISE
    22:46 Observing                                                                                                                                                                                                                                                                                                    

Start Time System Name Location Lazer_Haz Task Time End
19:33 SAF Laser HAZARD LVEA YES LVEA is Laser HAZARD 15:33
15:00 FAC Kim, Nelly LVEA YES Tech clean 15:09
15:04 FAC Randy, Chris LVEA n Craning around BSC2 18:46
15:09 FAC Kim EX n Tech clean 16:14
15:10 FAC Nelly EY n Tech clean 16:10
15:10 PSL Jason PSL YES RefCav Alignment 16:38
15:20 VAC Janos, Travis MX, MY n Pump install 19:21
15:22 EE Fil CER, LVEA n Cable pulling 18:14
15:24   Camilla LVEA n Transitioning to LASER SAFE 15:40
15:27 EE Marc CER/LVEA n Pulling cables 18:47
15:31 VAC Gerardo LVEA n Removing turbo pump 17:31
15:42   Christina, Nichole LVEA n 3IFO inventory 18:25
15:55   Richard LVEA n Surverying the floor (people) for any weaknesses 16:12
15:56 PEM Sam LVEA n Talking to Fil and looking at accelerometers 16:12
16:12 FAC Nelly HAM Shack n Tech clean 17:09
16:13 EPO Amber, Tour LVEA n Tour 16:31
16:16 FAC Kim HAM Shack n Tech clean 17:09
16:16 SEI Jim LVEA n HEPI accumulator checks 17:34
16:35 EPO Sam, Tooba, +1 LVEA n Tour 17:31
17:05 EPO Mike +2 Spokane Review LVEA n Tour 18:34
17:06 EE Jackie LVEA n Joining Fil and Marc 18:47
17:13 FAC Nelly, Kim LVEA n Tech clean 18:19
17:34   Richard LVEA n Checking on work 17:51
17:44   Camilla LVEA n Looking for Richard 17:51
18:02   Richard, Tooba, +1 Roof n Being on the roof 18:14
18:34   Camilla LVEA YES Transitioning LVEA to laser hazard 18:47
18:41 SQZ Sheila, Matt, Jennie LVEA YES SQZT0 table work 20:04
18:46 EPO Mike, Spokane Review YARM n Driving down YARM 20:21
18:47 SQZ Camilla LVEA YES Joining SQZ crew 20:04
18:49 LASER LVEA is LASER HAZARD LVEA YES LVEA IS LASER HAZARD 09:49
20:21 VAC Janos, Travis MY n Continuing pump work 22:17
20:29   Christina, Nichole MX, MY n 3IFO 21:59
23:15 VAC Janos MY n Turning off pump 00:45