5 day increments.
I chose 5 days before June 16th because on June 16th there was a ReflAir Phase change, and 5 days later there was another change to ReflAir phasing.
So given a window of 5 days in between 2 changes I chose 5 days before, 5 days between changes, and DRMI after the last change for 5 days.