Displaying report 1-1 of 1.
Reports until 16:33, Monday 18 August 2025
H1 General
ryan.crouch@LIGO.ORG - posted 16:33, Monday 18 August 2025 (86421)
OPS Monday day shift summary

TITLE: 08/18 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 150Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: We're still locked! 49.5 hours now, high frequency SQZing was a little worse after commissioning.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
18:49 LASER LVEA is LASER HAZARD LVEA YES LVEA IS LASER HAZARD 09:49
17:13 ISC Betsy Optics lab N Check for parts/tools 17:38
17:14 VAC Travis MidY N Check on pumps 17:27
17:19 CAL Tony PCAL lab LOCAL Start a measurement 18:22
18:55 CAL Tony PCAL lab LOCAL Look at beamspots 19:11
19:22 CAL Rick, Dripta PCAL lab LOCAL Checks 20:15
20:01 CAL Tony PCAL lab LOCAL Join team 20:15
20:13 ISC Betsy Optics lab LOCAL Parts/tools checks 21:15
20:14 ISC Camilla Optics lab LOCAL Join Betsy 21:15
20:31 ISC Keita Optics lab LOCAL Housekeeping, ISS array 21:24
20:46 ISC Rahul Optics lab LOCAL ISS Array work 22:30
20:51 ISC Jennie Optics lab LOCAL ISS array work 22:30
21:26 VAC Travis Ends N Moving equipment for tomorrow 23:02
23:18 CAL Rick, Dripta, Tony PCAL lab LOCAL Finish measurement Ongoing

15:36 - 18:33 UTC Comissioning

Images attached to this report