LHO General
thomas.shaffer@LIGO.ORG - posted 16:33, Tuesday 19 August 2025 (86439)
Ops Day Shift End

TITLE: 08/19 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Maintenance day today. An early Norco LN2 truck caused some noise before maintenance (alog86437) and a late LN2 truck delayed locked a bit. While we were waiting Elenna was able to get the PRMI ASC working again, yay! (alog86456). I left BRS X sensor correction on while the LN2 truck was filling at EX and we were still able to lock PRMI/DRMI without issue. The BRS velocities seemed relatively calm during that time.

Relocking has been a bit of a struggle and is still ongoing. DRMI is taking very long to lock, and the few times that we have gone past, we've seen DHARD move us away to a lock loss. Right now Elenna and Jenne are working on the issue.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
18:49 LASER LVEA is LASER HAZARD LVEA YES LVEA IS LASER HAZARD 15:29
14:57 PCAL Tony PCAL lab yes Prep for Tues meas. 15:21
15:06 SYS Randy, Mitchell LVEA - N bay no Craning 18:08
15:17 CDS Dave Remote n NDS1 restart 15:21
15:17 SAF Oli LVEA YES -> No Transition to laser SAFE 15:28
15:22 FAC Tyler LVEA yes Measure a few things 15:23
15:24 FAC Tyler, Eric CS no Hydrant testing 18:13
15:29 PCAL Tony, Francisco EX Yes PCAL meas. 18:38
15:30 CDS/PEM Fil EX n Roof weather station fix 17:32
15:37 FAC Kim LVEA n Tech clean 16:57
15:41 FAC Chris LVEA n Battery maint. 16:50
15:44 VAC Travis, Janos MY n Vac pump work 19:17
15:59 PCAL Rick, Dripta PCAL lab yes PCAL work (Dripta out 17:33) 18:25
16:21 ISC Daniel LVEA n ASC whitening chassis 16:21
16:37 PEM TJ LVEA n Moving dust monitor 17:36
16:48   Betsy LVEA n Looking for parts and checking on people 17:29
16:51 FAC Chris MX, EX n Filter checks 17:26
16:57 FAC Kim EY n Tech clean 17:43
17:01   Richard LVEA n Checking on people 17:29
17:16 PEM Sam, Gerardo LVEA n Y arm acc. mounting 17:45
17:18   Camilla LVEA n Dropping off parts 17:39
17:33 EE Fil LVEA n Looking at rack and table positioning 18:43
17:44 FAC Kim EX yes Tech clean 18:42
17:44 SYS Betsy LVEA n More parts 17:55
17:54 SQZ Camilla, Jennie CR n OMC scans, SQZ single bounce, no IMC 19:35
18:11 FAC Chris MY n Battery checks 18:36
18:40 SPI Tony PCAL Lab y(local) Setting up PS4/5 SPI measurement 19:08
18:54 VAC Norco EX n LN2 fill 20:17
19:18 FAC Tyler Vertex n Excavating 20:30
19:40 FAC Eric EX,EY n Check in mech rooms 20:19
20:07 OPS Tony LVEA n LVEA sweep 20:19
21:08 ISC Camilla Opt Lab n Parts 21:26
23:00 PCAL Rick, Dripta Opt Lab yes PCAL labbing 00:30