TITLE: 08/19 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Maintenance day today. An early Norco LN2 truck caused some noise before maintenance (alog86437) and a late LN2 truck delayed locked a bit. While we were waiting Elenna was able to get the PRMI ASC working again, yay! (alog86456). I left BRS X sensor correction on while the LN2 truck was filling at EX and we were still able to lock PRMI/DRMI without issue. The BRS velocities seemed relatively calm during that time.
Relocking has been a bit of a struggle and is still ongoing. DRMI is taking very long to lock, and the few times that we have gone past, we've seen DHARD move us away to a lock loss. Right now Elenna and Jenne are working on the issue.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
18:49 | LASER | LVEA is LASER HAZARD | LVEA | YES | LVEA IS LASER HAZARD | 15:29 |
14:57 | PCAL | Tony | PCAL lab | yes | Prep for Tues meas. | 15:21 |
15:06 | SYS | Randy, Mitchell | LVEA - N bay | no | Craning | 18:08 |
15:17 | CDS | Dave | Remote | n | NDS1 restart | 15:21 |
15:17 | SAF | Oli | LVEA | YES -> No | Transition to laser SAFE | 15:28 |
15:22 | FAC | Tyler | LVEA | yes | Measure a few things | 15:23 |
15:24 | FAC | Tyler, Eric | CS | no | Hydrant testing | 18:13 |
15:29 | PCAL | Tony, Francisco | EX | Yes | PCAL meas. | 18:38 |
15:30 | CDS/PEM | Fil | EX | n | Roof weather station fix | 17:32 |
15:37 | FAC | Kim | LVEA | n | Tech clean | 16:57 |
15:41 | FAC | Chris | LVEA | n | Battery maint. | 16:50 |
15:44 | VAC | Travis, Janos | MY | n | Vac pump work | 19:17 |
15:59 | PCAL | Rick, Dripta | PCAL lab | yes | PCAL work (Dripta out 17:33) | 18:25 |
16:21 | ISC | Daniel | LVEA | n | ASC whitening chassis | 16:21 |
16:37 | PEM | TJ | LVEA | n | Moving dust monitor | 17:36 |
16:48 | Betsy | LVEA | n | Looking for parts and checking on people | 17:29 | |
16:51 | FAC | Chris | MX, EX | n | Filter checks | 17:26 |
16:57 | FAC | Kim | EY | n | Tech clean | 17:43 |
17:01 | Richard | LVEA | n | Checking on people | 17:29 | |
17:16 | PEM | Sam, Gerardo | LVEA | n | Y arm acc. mounting | 17:45 |
17:18 | Camilla | LVEA | n | Dropping off parts | 17:39 | |
17:33 | EE | Fil | LVEA | n | Looking at rack and table positioning | 18:43 |
17:44 | FAC | Kim | EX | yes | Tech clean | 18:42 |
17:44 | SYS | Betsy | LVEA | n | More parts | 17:55 |
17:54 | SQZ | Camilla, Jennie | CR | n | OMC scans, SQZ single bounce, no IMC | 19:35 |
18:11 | FAC | Chris | MY | n | Battery checks | 18:36 |
18:40 | SPI | Tony | PCAL Lab | y(local) | Setting up PS4/5 SPI measurement | 19:08 |
18:54 | VAC | Norco | EX | n | LN2 fill | 20:17 |
19:18 | FAC | Tyler | Vertex | n | Excavating | 20:30 |
19:40 | FAC | Eric | EX,EY | n | Check in mech rooms | 20:19 |
20:07 | OPS | Tony | LVEA | n | LVEA sweep | 20:19 |
21:08 | ISC | Camilla | Opt Lab | n | Parts | 21:26 |
23:00 | PCAL | Rick, Dripta | Opt Lab | yes | PCAL labbing | 00:30 |