Displaying report 1-1 of 1.
Reports until 10:48, Tuesday 19 August 2025
H1 PEM (OpsInfo)
thomas.shaffer@LIGO.ORG - posted 10:48, Tuesday 19 August 2025 (86444)
Moved Dust Monitor #10 from the bier garten to the corner of the platform on BSC2

I moved DM10 to the working platform on the +X+Y corner of BSC2 so we can get some dust readings up at that level in preparation for dome removal post O4. I was hoping to get it further away from the edge of the clean room, but the RS232 cable was stretched to its max. I velcrostripped and zip tied the unit as well as the cabled to keep things from falling off and to relieve stress. I also verified that the unit was still getting 2.8L/min since I had to disconnect and reconnect the vacuum hose. It looks to be running well and we can connect to it in epics.

Ops: Please note if this monitor starts to alarm.

Images attached to this report
Displaying report 1-1 of 1.