TITLE: 08/28 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 153Mpc
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY:
Comissioning was cut short due to an ill timed Lockloss during the Calibration Simuline sweep.
Vacuum team is running a pump in their Vac Lair for about an Hour starting around 18:30 But they stopped before NLN.
Jeff and Robert got a few tests done today from 1900-1930 UTC
NLN reached at 19:06 UTC
Back to observing at 19:30:43 UTC
Another Lockloss at 20:37:23 UTC
Back to Observing at 21:51 UTC, But there was an interesting PR3 SDF Diff that was going to wake up the OWL Shift. so we dropped to commissioning at 21:51 UTC.
Back to Observing at 21:53 UTC.
Elenna found the Issue and loaded ISC_ LOCK which took us back down to commissioning again for 2 secs at 22:00:29 UTC.
and Finally Back to Observing again at 22:00:31 UTC.
GRB-Short E595035
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
15:01 | FAC | Kim & Nellie | Receiving | N | Loading cart | 15:31 |
15:01 | PEM | Robert | LVEA | N | Setting up shakers | 15:48 |
16:00 | FAC | Kim | Optics lab | N | Technical Cleaning | 16:30 |
16:29 | EE | Marc | LVEA | N | Looking for tools. | 16:36 |
16:37 | SUS | Betsy | LVEA Highbay | N | Getting parts. | 16:22 |
16:47 | PEM | Robert | LVEA | N | Settign up PEM equipment for Acoustic injections | 18:16 |
18:58 | SUS | Jeff | Control Rm | N | PR3 Estimating | 19:30 |
19:08 | PEM | Robert | Control RM & LVEA | N | Running sweeps through 10 - 40 hz | 19:28 |
20:59 | Cbex | Tyler & CBEX | Mid Y | N | Geo Survey | 23:59 |
22:12 | VAC | Anna & Janos | Mid X | N | Taking measurements and checking on 343B Pump | 22:42 |
23:08 | EE | Marc | Optics lab | N | Making connector | 23:53 |