TITLE: 09/02 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 149Mpc
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: A fair amount of work done even though it was looking to be a slower maintenance day. We managed to stay locked for a few hours into it, while staying in light maintenance mode. We relocked automatically with an initial alignment, then lost lock 39 seconds later from an ETMX glitch. On the way up the second time, Elenna opportunistically tuned up PRMI ASC since it has shown some signs of non-convergence (alog86694). We have now been locked for 2.5 hours while a small dropout when the SQZr unlocked.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:30 | CDS | Fil, Erik | EX | n | HWWD cable | 16:10 |
| 15:31 | FAC | Erik | Ends | n | Chiller alarms | 16:03 |
| 15:34 | FAC | Kim, Nelly | mids, ends | n | Mats | 15:35 |
| 15:34 | FAC | Randy | CS | n | Forklift from VPW to LSB | 16:28 |
| 15:35 | FAC | Tyler | vertex | n | Fire hydrant | 15:36 |
| 15:35 | VAC | Norco | CP7 (EY) | n | LN2 delivery | 16:54 |
| 15:36 | VAC | Travis | MX | n | Pump work | 20:03 |
| 15:37 | FAC | Tyler | LVEA | n | Yellow tape | 15:38 |
| 15:37 | FAC | Someone | Staging | n | Rock moving | 19:35 |
| 15:38 | FAC | - | site | n | Fire pumps running | 19:33 |
| 15:43 | SQZ | Sheila | CR | n | SQZ meas. | 16:34 |
| 15:55 | VAC | Janos | MX | n | Joining Travis for pump work | 20:03 |
| 15:56 | SEI | Jim | EX, EY | n | Wind fence inspection | 17:53 |
| 15:58 | FAC | Kim, Nelly | LVEA | n | Tech clean | 17:04 |
| 16:12 | CDS | Fil | LVEA | n | SUS56 racks and near HAM3 racks, cable and chassis prep | 17:16 |
| 16:15 | FAC | Randy, Tyler | OSB rec., LVEA | n | Forklift into OSB receiving and then moving into LVEA (craning?) | 16:33 |
| 16:27 | VAC | Gerardo, Jordan, Anna | LVEA | n | Taking measurements near HAM6 (Jordan, Anna out 1659) | 17:17 |
| 16:34 | FAC | Chris | LVEA, Y arm, X arm | n | Pest control escort | 17:52 |
| 16:37 | PCAL | Rick, Tony | PCAL lab | local | PCAL lab meas. | 20:23 |
| 16:42 | ISC | Daniel | LVEA | n | AS_C whitening cable | 18:32 |
| 16:53 | PSL | Jason | CR | n | Ref cav remote alignment | 17:11 |
| 17:01 | - | Richard | LVEA | n | LVEA check | 17:26 |
| 17:05 | FAC | Kim, Nelly | EY, EX | n | Tech clean | 18:24 |
| 17:21 | PEM | Robert | LVEA | n | Shaker setup | 19:35 |
| 17:32 | CDS | Marc | MY, EY | n | Checking on power supplies | 18:05 |
| 17:51 | SYS | Betsy | LVEA | n | Grabbing dog clamps | 18:08 |
| 17:53 | FAC | Chris | LVEA | n | FAMIS checks | 18:26 |
| 18:08 | SYS | Betsy | Opt Lab | - | Parts | 18:38 |
| 18:24 | FAC | Kim, Nelly | FCES | n | Tech clean | 18:50 |
| 18:27 | FAC | Chris | Ends, Mids | n | FAMIS checks | 18:54 |
| 18:35 | SQZ | Camilla, Fil | LVEA - SQZT7 | LOCAL | Noise hunt | 19:05 |
| 18:42 | SYS | Mitchell | LVEA - W | n | Parts hunt | 18:53 |
| 18:47 | - | Matt | LVEA | n | Sweep | 19:05 |
| 18:56 | VAC | Gerardo, Jordan | MY | n | Parts hunt | 19:35 |
| 19:46 | PEM | Robert | LVEA | n | Wrapping up | 20:03 |
| 21:38 | PCAL | Francisco | PCAL lab | - | Packing up to ship out | 22:33 |
| 22:12 | SYS | Betsy | Opt Lab | n | Parts | 22:40 |
| 22:51 | ISC | Camilla | Opt Lab | n | Parts hunt | 23:17 |