TITLE: 09/03 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 156Mpc
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:
Today we had Commissioning time to make up for the time from Monday's holiday. Also had the opportunity to take H1 to the new ASC High Gain mode to ride out a Magnitude 6.0 earthquake! H1 is approaching 26.5hrs of lock.
LOG:
- 1435-1503 emergency light replacement @mx
- 1436 Check-in chat with RRT in teamspeak
- 1500-1530 Calibration
- 1503 opening receiving for grabbing cardboard & then garbage at woodshop via elec cart (kim)
- 1503-1550 MY cleaning (nellie)
- 1530 Commissioning Begins
- 1530-1615Robert measurements first
- 1617-1630 Walking quietly in lvea (robert)
- CR measurements
- 1616-1626 Jim HAM1 injection
- 1627 Sheila/camilla measurements
- 1557-1725 End Station trips (no VEA entry) for HEPI/Dust Monitor FAMIS (mitch)
- 1602-1626 EX to take a photo (no VEA entry) (chris)
- 1643-1702 SPI inventory in optics lab (jeffk)
- 1655-1740 TCS chiller FAMIS check (corey)
- 1723-1743 Optics lab clean & checks (kim)
- 1745-1849 MX cleaning (kim)
- 1755 Surveryors escorted to MY for CEBEX (tyler)
- 1813-1818 Checking ISC table enclosure vents in LVEA (corey---went out when Robert went out)
- 1838 Commissioning Ends
- 2023-2048 Dropping off stuff at MY (travis)
- 2102 EQ alert for M6.0 in Aleutians & SURVIVED via "ASC High Gain" Mode! (alog)
- 2112 - 2157 Out of Observing to "ride" the EQ
- 2115-2220 Benton PUD arrives to work at MY for CEBEX
- 2248 Taking a measurement in the Optics Lab area (travis)