TITLE: 09/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Earthquake
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: We stayed locked the whole shift, 14 hours. We dropped obs to ride though a 6.4, we're still waiting to leave EQ mode.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:18 | ISC | Corey | Optics lab/vac prep | N | JAC parts | 14:50 |
15:09 | FAC | Nellie | MidY | N | Tech clean | 15:53 |
15:11 | FAC | Kim | MidX | N | Tech clean | 15:36 |
16:32 | OPS | RyanC | Optics lab | N | Restart dust monitor | 16:35 |
17:20 | FAC | Nellie | H2 encl | N | Tech clean | 17:31 |
18:35 | FAC | Tyler, C&E | Vertex | N | Checkout firehydrant | 18:46 |
19:05 | FAC | Tyler, CeBEX contractor | MidY | N | CEBEX work | 23:29 |
19:59 | VAC | Travis | MidY | N | Parts pickup | 20:25 |