Reports until 16:32, Monday 08 September 2025
H1 General
ryan.crouch@LIGO.ORG - posted 16:32, Monday 08 September 2025 (86783)
OPS Monday day shift summary

TITLE: 09/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Earthquake
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: We stayed locked the whole shift, 14 hours. We dropped obs to ride though a 6.4, we're still waiting to leave EQ mode.
LOG:                                                                                                                                                                     

Start Time System Name Location Lazer_Haz Task Time End
14:18 ISC Corey Optics lab/vac prep N JAC parts 14:50
15:09 FAC Nellie MidY N Tech clean 15:53
15:11 FAC Kim MidX N Tech clean 15:36
16:32 OPS RyanC Optics lab N Restart dust monitor 16:35
17:20 FAC Nellie H2 encl N Tech clean 17:31
18:35 FAC Tyler, C&E Vertex N Checkout firehydrant 18:46
19:05 FAC Tyler, CeBEX contractor MidY N CEBEX work 23:29
19:59 VAC Travis MidY N Parts pickup 20:25