TITLE: 09/09 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 154Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY: It was a pretty standard maintenance day with a few aftershocks from the oregon earthquake to slow down the reacquisition. Observing for 2.75hours.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:44 | SYS | Betsy | Opt Lab | n | In and out of lab for stuffs, quick into the LVEA for more parts | 16:35 |
14:47 | CEBEX | Bubba, contractors | MY | n | Drilling and surveying | 22:41 |
15:00 | SYS | Randy | OSB | n | Forklifting to mech room | 15:22 |
15:00 | FAC | Kim | EX | n | Tech clean | 16:02 |
15:00 | FAC | Nelly | EY | n | Tech clean | 15:49 |
15:08 | VAC | Jordan, Gerardo, Anna | LVEA | n | NEG pump regen, GV checks, valve in NEG | 17:58 |
15:10 | FAC | Chris | site | n | Forklifting from staging to woodshop area | 17:00 |
15:15 | CDS | Fil | LVEA | n | Cable trays near HAM5 with Ken & Drilling with Randy | 18:54 |
15:15 | FAC | Ken | LVEA | n | LVEA light replacement | 18:49 |
15:22 | FAC | Christina | VPW | n | Fork lifting | 15:42 |
15:22 | SYS | Randy | LVEA | n | W & E bay craning | 17:22 |
15:30 | SYS | Mitchell | LVEA | n | Grabbing parts | 15:50 |
15:43 | OPS | Richard | LVEA | n | Checking on things | 16:03 |
15:47 | VAC | Janos | MX, MY | n | Pump install work continuing | 18:55 |
15:49 | FAC | Nelly, Kim | FCES | N | Tech clean | 16:55 |
15:58 | GRD | TJ | CR | n | h1guardian1 reboot | 16:07 |
16:38 | PEM | Sam, Jonathan (student) | LVEA | n | Tour/ looking at PEM things | 17:34 |
16:50 | ISC | Daniel | LVEA | n | OMC whitening chassis removal | 17:16 |
16:51 | FAC | Mitchell | Mid X | N | moving pelican cases | 17:38 |
16:51 | TSC | TJ | Mech rm -> LVEA | N | Folling chiller lines | 17:32 |
16:55 | safety | McCarthy | LVEA | N | Checking on the LVEA safety | 17:42 |
16:56 | FAC | Kim & Nelly | High bay & LVEA | N | Technical cleaning garbing supplies | 18:34 |
17:07 | SUS | Ryan C | Crtl Rm | N | ETMX OPLEV SUS charge measurements | 18:41 |
17:27 | OPT | Camilla | LVEA, OpticsLab | n | Looking for parts | 18:04 |
17:39 | PCAL | Tony, Mitchell | PCAL Lab | - | Looking for parts | 17:53 |
17:52 | SYS | Randy | EY | n | Check in receiving | 18:17 |
17:54 | CDS | Marc | LVEA | n | Check in with Fil | 18:04 |
18:18 | SYS | Randy | LVEA | n | Take some measurements | 18:34 |
18:32 | - | Richard, student | OSB roof | n | Roof tour | 18:47 |
18:42 | VAC | Jordan, Anna, Gerardo | LVEA | n | Shut down NEG pump | 19:14 |
18:51 | - | Oli | LVEA | n | Sweep | 18:58 |
19:09 | FAC | Tyler | MY | n | Checking with crew down there | 21:11 |
19:51 | - | Fil, Betsy | LVEA | n | Measure something | 20:11 |
21:47 | SPI | Jeff | OpticsLab | n | Figuring out what is in the bag | 21:59 |