LHO General
thomas.shaffer@LIGO.ORG - posted 16:28, Tuesday 09 September 2025 (86812)
Ops Day Shift End

TITLE: 09/09 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 154Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY: It was a pretty standard maintenance day with a few aftershocks from the oregon earthquake to slow down the reacquisition. Observing for 2.75hours.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:44 SYS Betsy Opt Lab n In and out of lab for stuffs, quick into the LVEA for more parts 16:35
14:47 CEBEX Bubba, contractors MY n Drilling and surveying 22:41
15:00 SYS Randy OSB n Forklifting to mech room 15:22
15:00 FAC Kim EX n Tech clean 16:02
15:00 FAC Nelly EY n Tech clean 15:49
15:08 VAC Jordan, Gerardo, Anna LVEA n NEG pump regen, GV checks, valve in NEG 17:58
15:10 FAC Chris site n Forklifting from staging to woodshop area 17:00
15:15 CDS Fil LVEA n Cable trays near HAM5 with Ken & Drilling with Randy 18:54
15:15 FAC Ken LVEA n LVEA light replacement 18:49
15:22 FAC Christina VPW n Fork lifting 15:42
15:22 SYS Randy LVEA n W & E bay craning 17:22
15:30 SYS Mitchell LVEA n Grabbing parts 15:50
15:43 OPS Richard LVEA n Checking on things 16:03
15:47 VAC Janos MX, MY n Pump install work continuing 18:55
15:49 FAC Nelly, Kim FCES N Tech clean 16:55
15:58 GRD TJ CR n h1guardian1 reboot 16:07
16:38 PEM Sam, Jonathan (student) LVEA n Tour/ looking at PEM things 17:34
16:50 ISC Daniel LVEA n OMC whitening chassis removal 17:16
16:51 FAC Mitchell Mid X N moving pelican cases 17:38
16:51 TSC TJ Mech rm -> LVEA N Folling chiller lines 17:32
16:55 safety McCarthy LVEA N Checking on the LVEA safety 17:42
16:56 FAC Kim & Nelly High bay & LVEA N Technical cleaning garbing supplies 18:34
17:07 SUS Ryan C Crtl Rm N ETMX OPLEV SUS charge measurements 18:41
17:27 OPT Camilla LVEA, OpticsLab n Looking for parts 18:04
17:39 PCAL Tony, Mitchell PCAL Lab - Looking for parts 17:53
17:52 SYS Randy EY n Check in receiving 18:17
17:54 CDS Marc LVEA n Check in with Fil 18:04
18:18 SYS Randy LVEA n Take some measurements 18:34
18:32 - Richard, student OSB roof n Roof tour 18:47
18:42 VAC Jordan, Anna, Gerardo LVEA n Shut down NEG pump 19:14
18:51 - Oli LVEA n Sweep 18:58
19:09 FAC Tyler MY n Checking with crew down there 21:11
19:51 - Fil, Betsy LVEA n Measure something 20:11
21:47 SPI Jeff OpticsLab n Figuring out what is in the bag 21:59