TITLE: 09/10 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: Locked for about 10 hours when a brief power outage on site took everything down. We have been in recovery since (see list of alogs below). We are currently getting the IMC to lock after realizing that there was an issue with the whitening and Daniel logged into Beckhoff to fix it.
Power outage alogs:
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End | 
|---|---|---|---|---|---|---|
| 15:11 | CEBEX | Bubba, contractors | MY | n | CEBEX building prep | 23:04 | 
| 15:51 | FAC | Christina | OSB rec. | n | Rollup door to drip off packages | 15:56 | 
| 16:41 | FAC | Randy, Eric | MY | n | Check on something | 19:59 | 
| 17:18 | SYS | Betsy | Opt Lab | n | Parts | 17:22 | 
| 19:19 | VAC | Eric | Ends | n | Getting HVAC at ends checks | 20:04 | 
| 19:20 | VAC | Gerardo | LVEA | n | Reset Ion pumps for RGAs | 19:43 | 
| 19:21 | VAC | Jordan | Ends | n | Reset ion pumps for RGAs | 19:51 | 
| 19:25 | - | Fil | Ends | n | Turning on lasers and checking HV | 20:25 | 
| 19:36 | VAC | Travis | LVEA | n | Grab a part | 19:42 | 
| 19:36 | VAC | Travis | MY | n | Pump work | 19:58 | 
| 19:47 | PSL | Richard | LVEA | n | PSL diode controller power cycle at PSL racks | 19:58 | 
| 19:48 | SEI | Jim | Mech room | n | HEPI pump startup | 20:04 | 
| 19:59 | VAC | Travis | LVEA | n | Parts | 20:16 | 
| 20:04 | SEI | Jim | Ends | n | HEPI pump stations | 21:24 | 
| 20:07 | CDS | Erik | EX | n | Power dolphin extender | 20:34 | 
| 20:35 | CDS | Fil | EX | n | HEPI trouble shooting | 21:10 | 
| 21:25 | SYS | Betsy | LVEA | n | Taking pictures of HAM2/3 | 21:41 | 
| 21:38 | VAC | Travis, Janos | MY | n | Pump work | 22:22 | 
| 21:40 | EE | Marc | LVEA | n | Checking out fast shutter electronics | 21:58 |