After flushing the cut & reconnected fluid lines since 6 August at near full motor speed, this morning I reintroduced fluid to the Actuators in Bleed mode. The pressure set point was stepped up to 80psi. While these Actuators saw operation at BSC6 during the single arm period, they still may need bleeding after having the four way valves disconnected. I inspected the new connections and detected no leaks; will check again later today. We'll put these actuators into run mode early next week and we'll be in ready state. Still need wiring to the piers...