Displaying report 1-1 of 1.
Reports until 10:43, Tuesday 16 September 2025
H1 ISC
camilla.compton@LIGO.ORG - posted 10:43, Tuesday 16 September 2025 (86962)
Beam Profiles Taken of MC REFL on IOT2L

Sheila, Elenna, Camilla. WP#12797 . IOT2L layout D1300357

We took the PSL input power down to ~100mW, locked out the rotation stage and then used the nano scan to take some beam profiles in the IMC REFL path on IOT2L. Elenna and Sheila also moved a beamdump to fully block the MC REFL rejected beam that was getting on the MC REFL camera. 

Location D4 Sigma A1 Horizontal (um) D4 Sigma A2 Vertical (um) D4 Sigma A1 at 45deg (um) D4 Sigma A2 at 45deg (um)
A: Profiler 11 3/4" upstream of IO_MCR_BS1 4685 4240 4345 4450
B: Profiler 10 1/16" downstream of IO_MCR_BS1 (7" + 1 1/4" + 1 13/16") 4678 4647 4605 47921
C: Profiler 14 1/2" downstream of IO_MCR_BS1 (7" + 1 1/4" + 6 1/4") 4800 4807 4784 4676

By eye the beam looked gaussian and the numbers show it is mainly symmetric. Maybe last measurements where when the WFS were being installed in 2013 6439

For positions B and C, we added a temporary steering mirror between IO_MCR_M7 and IO_MCR_L2. Distance between IO_MCR_BS1 and IO_MCR_M7 = 7"; Distance bewtween IO_MCR_M7 = 7" and temporary steering mirror = 1 1/4". 

Images attached to this report
Displaying report 1-1 of 1.