HAM 7 has the HEPI frames as well as the weldments in place and ready for the crossbeam. The jacks holding up the support tubes had to be relocated to give clearance to the clamps as well as allowing an extension piece to be attached to the end of the support tube. To do this two jacks and the top clamp were used to cradle the support tube while the extension was attached and the jack relocated. The crossbeam is rigged with a spreader bar and should be ready to install shortly.