TITLE: 09/22 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Currently in Commissioning due to SQZ filter cavity issues. We've been Locked for almost 7.5 hours. The ETMY Roll mode is still decently high, but it is damping, and it might take multiple days until it's all the way back down.
LOG:
14:30 UTC Observing and have been Locked for 4.5 hours
14:41 Earthquake mode activated
14:41 Out of Observing and ASC Hi Gains turned on for earthquake
14:43 Lockloss
16:05 NOMINAL_LOW_NOISE
    18:40 Observing
    19:55 Out of Observing to fix up SDFs
    20:01 Back into Observing
    21:14 GRB-Short E601590
    22:01 Out of Observing to commission SQZ FC issues

Comments related to this report
ryan.crouch@LIGO.ORG - 16:38, Monday 22 September 2025 (87070)

                                                                                                                                      

Start Time System Name Location Lazer_Haz Task Time End
14:45 FAC Kim MX n Tech clean 16:15
14:46 FAC Nellie MY n Tech clean 15:56
16:04   Travis MX n Rescuing a snake 16:15
16:50 PCAL Tony PCAL Lab y(local) Starting a measurement 18:20
19:54 PCAL Tony PCAL Lab y(local) Starting a measurement con't 20:48
20:49 PCAL Tony PCAL Lab y(local) Turning the light off because he forgot it on 20:52
20:51 VAC Travis MX, MY n Dropping off parts 21:25
21:32 ISC Betsy, Matt JOAT (JAC Of All Trades Room) (Formerly Vac Prep) n Something for JAC 21:48