Displaying report 1-1 of 1.
Reports until 16:38, Friday 26 September 2025
LHO General
thomas.shaffer@LIGO.ORG - posted 16:38, Friday 26 September 2025 (87165)
Ops Eve Shift Start

TITLE: 09/26 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Observing at 149Mpc
OUTGOING OPERATOR: Ibrahim
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 11mph Gusts, 6mph 3min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.33 μm/s 
QUICK SUMMARY: Locked for 9 hours, calm environment. The ETMY roll mode seems to be under control. It does "breathe" up and down a bit, but it isn't growing.

Displaying report 1-1 of 1.