TITLE: 09/27 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: TJ
SHIFT SUMMARY: The SQZer struggled a little before and during the calibration measurement, 1 lockloss that we are still recovering from (move spots as of 23:30).
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
16:48 | VAC | Pump | LVEA | N | AIP pumping on HAM6 | 02:42 |
22:16 | VAC | TJ | LVEA | N | Plug in ION pump | 22:21 |