Reports until 13:13, Saturday 27 September 2025
H1 SQZ (SQZ)
ryan.crouch@LIGO.ORG - posted 13:13, Saturday 27 September 2025 - last comment - 15:11, Monday 29 September 2025(87175)
OPS Saturday DAY shift update - SQZ issues
Comments related to this report
camilla.compton@LIGO.ORG - 15:11, Monday 29 September 2025 (87204)

As Ryan correctly identified, the issue to why the SQZ dropped was there was no enough green power to keep the OPO ISS locked. So he had to reduced the setpoint in sqzparams from 80uW to 75uW. It wouldn't surprise me if this happens again as we are still close to the botton of the ISS's range.

Tomorrow AM we'll check if we can get any more power with the SHG waveplate, otherwise we may need to realign through the AOM and into the fiber again as we last did in 86323 or move crystal spots.