TITLE: 09/29 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 149Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: We stayed locked the whole shift, 16 hours.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 16:48 | VAC | Pump | LVEA | N | AIP pumping on HAM6 | ongoing |
| 15:33 | PEM | Robert, Anamaria | LVEA | N | Set up PEM measurements | 16:26 |
| 16:04 | FAC | Randy | Xarm, before Mid | N | Inspections, power washing X1 midpoint | 21:29 |
| 16:16 | FAC | Nellie | MidY | N | Tech clean | 17:16 |
| 17:15 | CAL | Tony | PCAL lab | LOCAL | Turn on lights | 17:18 |
| 17:40 | PEM | Robert | LVEA | N | Change measurement | 17:55 |
| 17:56 | FAC | Chris | Optics lab | N | Look for bags | 18:04 |
| 21:15 | JAC | Corey | Vac prep lab | N | JAC table | 23:14 |