- EX feadthrough work
- dust monitor code change
- close GV19
- install spool X in LVEA
- reinstall cryopump EX
- test stand reinstall/level EY
- X arm spool oplev piers - drilled anchor bolts
- replace SUS and ISC HAM-A coil drivers, which are actually IO optics
- pull cables HAM6 to electronics room