TITLE: 10/16 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 151Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY: The DARM fom struggled this morning as it wasn't getting data from GDS and sometimes nds2, ETMY beam spot adjustment alog87508, and we had to swap the ITMY L2 sat amp box alog87515. A PRM filter was also turned off alog87523, and I accepted some CDS calibration report related SDFs. After we relocked post sat amp swap there was a 1Hz ringup seen in ASC, but it calmed down.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:01 | FAC | Randy | Yarm beam tube | N | Beam tube inspection, mid to corner | 17:56 |
| 15:04 | FAC | Kim , Nellie | VAC prep lab | N | Tech clean | 15:31 |
| 18:19 | ISC | Jennie | Vac Prep lab | N | Looks for parts | 19:30 |
| 18:23 | FAC | Kim, Nellie | Receiving, then Mids | N | Tech clean and look for stuff | 18:49 |
| 18:25 | PSL | Keita | Optics lab | N | ISS array, Laser Safe | 19:43 |
| 18:32 | PSL | Rahul | Optics lab | N | Join Keita | 19:43 |
| 19:04 | FAC | Eric | Staging | N | Move boom lift to LeXi | 19:29 |
| 20:06 | EE | Fil | LVEA | N | ITMY L2 sat amp swap | 20:16 |
| 20:39 | FAC | Randy | Xarm | N | Beamtube calking | 22:10 |
| 21:06 | PSL | Jennie | Optics lab, Vac prep | N | Check for parts/tools/cleanliness, Laser Safe | 22:00 |
| 21:34 | SUS | Rahul | LVEA, near PSL | N | Grab parts | 21:47 |
| 21:45 | PSL | Keita | Optics lab | N | ISS array work | 23:09 |