Procedure checklist for both stations completed. No issues were identified at this time.
MX: Scroll pump hours: 236.9
Turbo pump hours: 149
Crash bearings: 100%
EX: Scroll pump hours: 7157.3
Turbo pump hours: 1109
Crash bearings: 100%
EX purge air compressor was ran for ~3 hours, dew point monitor reached <-40 deg F in ~15 minutes and at time of shut down was reporting -76 degF.
Compressor has 74 running hours total, distributed between the three scroll compressors. Drains are operational, dryers indicate normal operation. The only caveat here is that compared to the EY compressor, the main drain (after the compressor) discharged a lot more water. This indicates a higher humidity in the EX MER.