Reports until 13:14, Monday 02 December 2013
H1 INS (INS)
jodi.fauver@LIGO.ORG - posted 13:14, Monday 02 December 2013 (8789)
ETMY Install Prep: BSC6 De-install
Two cleanings of the Test Stand/Work Space cleanrooms have been completed. The garbing-staging cleanroom was returned to the top of the E-module form the north side of the beamtube and re-cleaned.