Reports until 16:09, Friday 03 June 2011
H2 INS
greg.grabeel@LIGO.ORG - posted 16:09, Friday 03 June 2011 (879)
HAM 7 HEPI Install

The crossbeam has been mounted in place between the South end HEPI assemblies. Unfortunately the layout of the weldment and the frame is preventing some of the bolts from being torqued down. The bottle jacks and the work table will remain in place until some way of torquing the bolts down can be figured out. Once this problem is solved things should move fairly quickly for finishing out the HAM. 

Images attached to this report