Reports until 15:10, Monday 03 November 2025
H1 CDS
erik.vonreis@LIGO.ORG - posted 15:10, Monday 03 November 2025 (87927)
Fiber pair swapped for Corner Stateion to EY test

At about 1100 PST I swapped the fiber pair for Ethernet IPC testing from the MSR in the corner station to EY.  The new 4k pair is connected via patch fiber 24 at EY, replacing patch fiber 33.