TITLE: 11/04 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 149Mpc
INCOMING OPERATOR: Ryan C
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 6mph Gusts, 4mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.36 μm/s
SHIFT SUMMARY:
Lockloss from NLN , Lockloss tool failed again.
Thefirst channel that I was able to see deviate from its nominal operation was ETMX L3 channels.
screen shot attatched.
Relocking notes:
Relocked after another IA that unlocked and faulted the IMC after Saturating MC2. Doing a manual IA does not cause this issue.
Once passed DRMI, it locked without issue until NLN where the 1 hz ring up happened on the ASC-INP1-P. Elenna had me use the ASC high gain button for about a minute.
Once that had properly damped the oscillation and used the ASC Low gain button we were able to do some Observing.
Observing reached at 00:15:01 UTC
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:50 | FAC | Randy | Mid X | No | Sealing the Beam tube | 21:59 |
| 16:31 | PEM | Robert | LVEA | N | Setting up for Shaker injections, & now shutting down shakers | 19:16 |
| 16:32 | iss | Matt | Control Rm | N | ISS injections. | 17:16 |
| 16:33 | FAC | Nellie | Mid Y | N | Technical Cleaning | 17:33 |
| 16:33 | FAC | Kim | Mid Y | N | Technical cleaning | 17:25 |
| 18:29 | CDS | Erik | EY | N | swapping fibers at the racks. | 20:29 |
| 23:50 | CAL | Tony | PCAL lab | LOCAL | Prep for end station meas tomorrow | 00:35 |
| 00:49 | CAL | Rick | Receiving | N | Pick up PSL parts | 01:49 |
| 00:52 | OPS | Ryan | Optics lab | N | Check on dust monitor | 01:02 |