Reports until 16:55, Monday 03 November 2025
H1 General (Lockloss)
anthony.sanchez@LIGO.ORG - posted 16:55, Monday 03 November 2025 (87929)
Moday Ops Day shift & Lockloss

TITLE: 11/04 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 149Mpc
INCOMING OPERATOR: Ryan C
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 6mph Gusts, 4mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.36 μm/s
SHIFT SUMMARY:

Lockloss from NLN , Lockloss tool failed again.

Thefirst channel that I was able to see deviate from its nominal operation was ETMX L3 channels.
screen shot attatched.

Relocking notes: 
Relocked after another IA that unlocked and faulted the IMC after Saturating MC2. Doing a manual IA does not cause this issue.
Once passed DRMI, it locked without issue until NLN where the 1 hz ring up happened on the ASC-INP1-P. Elenna had me use the ASC high gain button for about a minute.
Once that had properly damped the oscillation and used the ASC Low gain button we were able to do some Observing.
Observing reached at 00:15:01 UTC

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:50 FAC Randy Mid X No Sealing the Beam tube 21:59
16:31 PEM Robert LVEA N Setting up for Shaker injections,  & now shutting down shakers 19:16
16:32 iss Matt Control Rm N ISS injections. 17:16
16:33 FAC Nellie Mid Y N Technical Cleaning 17:33
16:33 FAC Kim Mid Y N Technical cleaning 17:25
18:29 CDS Erik EY N swapping fibers at the racks. 20:29
23:50 CAL Tony PCAL lab LOCAL Prep for end station meas tomorrow 00:35
00:49 CAL Rick Receiving N Pick up PSL parts 01:49
00:52 OPS Ryan Optics lab N Check on dust monitor 01:02
Images attached to this report