Displaying report 1-1 of 1.
Reports until 21:59, Tuesday 04 November 2025
LHO General
corey.gray@LIGO.ORG - posted 21:59, Tuesday 04 November 2025 (87958)
Tues EVE Ops Summary

TITLE: 11/05 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:

Bit of a rough start to the shift with H1 having issues getting to NLN.  Managed to finally get to Observing after a few hours of work (see earlier alogs).  Violins were high (but not off the DARM FOM), and have steadily been dropping over the 2+hrs of this lock.

Had a LOW SQZ_PMC voltage, but squeezer lockloss and automatic relock brought the voltage back to a better state (70+ volts).
LOG:

Images attached to this report
Displaying report 1-1 of 1.