ITMX: Approximately 80% installed, still need to run cables and plug in electronics as well as connect the enclosures to the viewports, this requires a work permit so I'll wait till later today to get one signed. Beamsplitter: Data has been taken to calibrate the optlev signals using the M1 and M2 stage OSEMS, will analyze later today and append a graph to compare to other methods of calibrating.