Reports until 00:43, Tuesday 03 December 2013
H1 AOS (AOS)
thomas.vo@LIGO.ORG - posted 00:43, Tuesday 03 December 2013 (8796)
PRMI Optical Levers
ITMX: Approximately 80% installed, still need to run cables and plug in electronics as well as connect the enclosures to the viewports, this requires a work permit so I'll wait till later today to get one signed.

Beamsplitter: Data has been taken to calibrate the optlev signals using the M1 and M2 stage OSEMS, will analyze later today and append a graph to compare to other methods of calibrating.