Displaying report 1-1 of 1.
Reports until 15:49, Friday 07 November 2025
LHO General
thomas.shaffer@LIGO.ORG - posted 15:49, Friday 07 November 2025 (88006)
Ops Day Shift End

TITLE: 11/07 Day Shift: 1530-0000 UTC (0730-1600 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Recovery from the Mexico earthquake this morning was fairly fast, but it left rung up violin modes that took hours to damp to the point that we could go to low noise. Once in low noise we managed to Observe for over an hour before we lost lock from what seem to be an ETMX/DARM glitch. We ran an initial alignment and now we are powering up. The 0.3-1Hz seismic blrm is starting to come down, so that's a good thing.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:59 FAC Nellie Optics Lab N Technical cleaning 16:17
16:00 FAC SUS MY, EY N Caulking on Y-arm 19:46
17:33 ISS Keita, Rahul Optics Lab N Inventory - Keita out at 10:49 19:33
21:16 PCAL Tony PCAL Lab n Setup meas. 21:17
21:40 - Corey Opt Lab n Optics cleaning 23:15
21:54 ISC Kar Meng Opt Lab n Looking for parts 21:55
21:55 IO Rahul Opt Lab n Also cleaning optics 22:41
Displaying report 1-1 of 1.