Reports until 16:07, Wednesday 04 December 2013
LHO General
corey.gray@LIGO.ORG - posted 16:07, Wednesday 04 December 2013 (8810)
Ops DAY Summary

Day's Activities:

Swapping out PSL Chasis (Filiberto)

Greg craning dewar over Beam Tube in LVEA

Move ITMy Lower Structure to LVEA (Jeff/Andres)

Tumbleweed baling on X-arm

Lots of Apollo activity at EY (moving cleanrooms, platforms, E-module; installing BSC6 door, installing hard covers on Spool)

PSL work by Kiwamu (investigating mysterious RF jump by unplugging EOM cable); external shutter was also closed.  EOM was fixed in situ

PSL Shutter was replaced (Gerardo, Joe D.)

ACB work at EX (Gerardo/Mitch)

SUS work at EX (Betsy/Travis)

Had a couple of IOP SUS Watchdog INVALID alarms during shift; not really sure of the cause (also popped up window stating:  "Channel Access Exception...")

PSL Checks: