Displaying report 1-1 of 1.
Reports until 15:28, Monday 17 November 2025
H1 General (OpsInfo)
ryan.short@LIGO.ORG - posted 15:28, Monday 17 November 2025 (88145)
In-Lock SUS Charge Measurement Start Time Changed

I've updated the in-lock charge measurements to start 5 minutes earlier tomorrow morning, changing the start time from 7:45am to 7:40am PT.

These measurements have been finishing either right at 8:00am or 8:01am PT recently, so moving up the start time should allow us to be back in observing mode right up until the very end of the O4 run at 8:00am PT tomorrow morning. The magnetic injections have been finishing at either 7:39am or 7:40am PT, so especially considering ramptimes, I don't expect there to be any overlap issues.

The SUS_CHARGE Guardian has been saved and loaded with this change.

Displaying report 1-1 of 1.