Clean room was moved from BSC 6 to BSC 10, work platform disassembled at BSC 6 and reassembled around BSC 10. Clean room then moved back over BSC 10. E module relocated to east side of test stand clean room (only 3 bolts per leg) and in position. TIGHT FIT West door installed on BSC 9 and bolts torqued. Only 4 bolts in dome and east door, remainder to be installed and torqued tomorrow.