Displaying report 1-1 of 1.
Reports until 18:25, Friday 03 June 2011
H2 INS
patrick.thomas@LIGO.ORG - posted 18:25, Friday 03 June 2011 (882)
Ops Shift Summary
crossbeams installed on the mechanical test stand in the West bay

scheduled to move BSC6 into Y end VEA

The dust monitor in the bake oven room and at location 9 in the LVEA were replaced with a spare and the one in the control room. They both have calibration errors.
Non-image files attached to this report
Displaying report 1-1 of 1.