Ops Shift Summary
crossbeams installed on the mechanical test stand in the West bay

scheduled to move BSC6 into Y end VEA

The dust monitor in the bake oven room and at location 9 in the LVEA were replaced with a spare and the one in the control room. They both have calibration errors.