J. Kissel, O. Patane, After - Adding/updating DAC calibration compensation gains - Updating MEDM macros in order to confirm that DAC drive requests made it all the way out to the analog world on the right channels - Pausing guardians to make sure they didn't take control when we didn't want them to yet, - Making sure that all DAC requests were OFF - Untripping watchdogs and turning ON the MASTER SWITCH - Turning on small offsets to confirm those channel pathways were straight and linear, - Turning damping loops, one DOF at a time to confirm function and that they had roughly the right ~few second ring-down time - Turning on the alignment offsets to confirm that the whole suspensions move - Restoring all nominal ability for ISC output requests by resuming the guardian and running it from SAFE to ALIGNED a time or two, - Initiallizing new channels in SDF - Accepting differences in SDF (almost entirely the turning ON of calibration gains for the stages that were 18-bit DACs) We turned control over to the operations team with the words "all EY suspensions are confirmed functional and ready to use" at Dec 01 2025 ~15:45 PST (after having started at ~08:30 PST this morning; LHO:88274).