Ops Summary
CP3 alarmed, appears to have been filled
Cleaning at end Y
Apollo torqueing bolts at end X
Corner Station chiller 2 tripped, restarted by Ski

08:52 Joe and Gerardo swapping PSL light pipe shutter
09:05 Filiberto to look at end X transmon cabling
09:39 Joe and Gerardo done swapping PSL light pipe shutter
10:02 Sheila removing beam block from PSL table
10:34 Hugh reports that the corner station HEPI pumps tripped off early this morning
10:51 Dave, Kiwamu restarting H1 LSC model, DAQ restart
10:56 DAQ restart
11:16 Hugh modifying corner station HEPI pump controller (WP 4325)
11:19 Dave restarting all models on H1 ISC EY
13:02 Thomas V. working on ITMX optical lever enclosure/bellows
13:08 Safety inspection walking through the LVEA
13:28 Gerardo to LVEA to find Thomas V.
14:16 Arnaud running transfer functions on TMSX
14:17 Apollo removed dome and north door from BSC 10 (WP 4326)
15:22 Jeff K., Sheila and Arnaud purposely tripping chamber watchdogs
15:23 Hugh done modifying corner station HEPI pump controller (WP 4325)
15:36 Gerardo and Thomas V. done with optical lever enclosure/bellows