CP3 alarmed, appears to have been filled Cleaning at end Y Apollo torqueing bolts at end X Corner Station chiller 2 tripped, restarted by Ski 08:52 Joe and Gerardo swapping PSL light pipe shutter 09:05 Filiberto to look at end X transmon cabling 09:39 Joe and Gerardo done swapping PSL light pipe shutter 10:02 Sheila removing beam block from PSL table 10:34 Hugh reports that the corner station HEPI pumps tripped off early this morning 10:51 Dave, Kiwamu restarting H1 LSC model, DAQ restart 10:56 DAQ restart 11:16 Hugh modifying corner station HEPI pump controller (WP 4325) 11:19 Dave restarting all models on H1 ISC EY 13:02 Thomas V. working on ITMX optical lever enclosure/bellows 13:08 Safety inspection walking through the LVEA 13:28 Gerardo to LVEA to find Thomas V. 14:16 Arnaud running transfer functions on TMSX 14:17 Apollo removed dome and north door from BSC 10 (WP 4326) 15:22 Jeff K., Sheila and Arnaud purposely tripping chamber watchdogs 15:23 Hugh done modifying corner station HEPI pump controller (WP 4325) 15:36 Gerardo and Thomas V. done with optical lever enclosure/bellows