TITLE: 12/02 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 2mph Gusts, 1mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.30 μm/s
QUICK SUMMARY:
H1's been locked 13.5+hrs with a range hovering around132Mpc and no squeezing. There was a minor optics dust alarm at around 534amPDT (cleared in 10min).
1541: For Maintenance Day, took H1's SEI_ENV to Maintenance (from NLN/noSQZ) & this resulted in a lockloss.
I've bypassed some alarms:
Bypass will expire:
Tue Dec 2 02:30:20 PM PST 2025
For channel(s):
H0:VAC-LX_GV7_ZSM179A_VALVE_ANIM
H0:VAC-LY_GV5_ZSM159A_VALVE_ANIM
H1:CDS-STAT_NUMBER_OF_ERRORS
H1:DAQ-H1EDC_CHAN_NOCON