TITLE: 12/03 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Main goal for today was to continue to see troubleshoot H1 to see if it survived the CDS work from earlier this week (by trying to get H1 back to NLN)---Elenna and Sheila worked on this. There continued to be issues with ASC SRC---Elenna said this is common for H1 recoveries. Sheila also mentioned that the alignment issue most likely is a result of Gate Valve closures affecting the Green Camera alignment.
Recovery work above had to wait until about 11amPDT due to remaining LVEA crane inspections.
During Recovery work 20-bit DAC card was swapped out for one which was installed yesterday that had issues.
LOG:
- 1532-1605 Initial Alignment
- 1541 Crane inspection begins in South Bay [randy & CraneTech contractor]----> done in LVEA
- After lunch will do Staging and then FCES
- 1606-1613 Restart all of the models on h1iscex (this is for the the issue with the PCal for EX). [dave]
- 1640-1730 EY, EX trips to check on Dustmon Pumps (tj)
- 1659-1706 lvea walkthru (richard)
- 1707-1714 meet w/ crane inspector (tyler)
- 1729-1901 Moving magnetometer around HAM1 (rene, alicia)
- 1740-1755 Swapping in new Corner Station Dust Monitor pump & then checking flow (tj)
- 1756-1808 Testing out new dust monitors in the diode room (ryanC)
- 1803-1854 Power supply measurements at EX related to PCal & new DAC (tony)
- 1819-1840 Looking for picomotor mount assys in optics lab (jennie)
- 1839-1852 Parts hunt in West Bay (mitch)
- 1852-1857 LVEA walkthru (sheila)
- 1850 Restart locking H1
- darm to rf -> idle als -> dhard wfs
- Thought is GV soft closes affect green camera alignment so this causes recovery grief.
- 1941-2111 LVEA Tour for Michael Turner (cosmologist) & Dennis Overbye (NYT reporter) which was in CR and now moves to LVEA (mike, jenne)
- 2127-2156 Driving to EY
- 2206-2218 Drive to Overpass & then Back to LExC
- 2040-2139 Gantry crane inspections at Mechanical Room & FCES. This COMPLETES crane inspection. (randy, cranetech)
- 2140-2348 OPO testing + laser Hazard in the optics lab (KarMeng)
- 2145-2157 magnetometer tests in CER (alicia,rene)
- 2158 CHETA table work in the CHETA/JAC Lab (matt)
- 2200-2207 Hi-Bay trip (ibrahim)
- 2230-2308 h1iscex being shut down for the to investigate issues with 20-bit DAC (dave, tony)
- 2250 JAC table work in CHETA/JAC Lab (jennie)
- 2342 Looking for JAC parts in the LVEA (while we are locking H1). [jennie]
- 2310 Initial Alignment #2 of the day (post EX 20bit DAC swap)
-