The dome and door bolts are installed and tightend at BSC 9. Miscellaneous rigging, tools, o-ring protectors etc. was removed from E X and returned to corner/E Y, as needed. The north door and dome are removed from BSC 10. We returned the CPB jigs back to the corner station from E Y.