Reports until 16:10, Monday 06 June 2011
H2 INS
patrick.thomas@LIGO.ORG - posted 16:10, Monday 06 June 2011 (885)
dust monitor in lab prep room
The dust monitor in the lab prep room on top of the flow bench (location 2) is now powered from a wall outlet. The corresponding fuse on the RS485 loop is removed.