Displaying report 1-1 of 1.
Reports until 07:41, Tuesday 16 December 2025
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 07:41, Tuesday 16 December 2025 (88537)
OPS Day Shift Start

TITLE: 12/16 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 15mph Gusts, 10mph 3min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 1.00 μm/s 
QUICK SUMMARY:

IFO is in IDLE for PLANNED ENGINEERING

A look at today's planned activities:

 

Displaying report 1-1 of 1.