TITLE: 12/18 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 13mph Gusts, 10mph 3min avg
Primary useism: 0.06 μm/s
Secondary useism: 0.36 μm/s
QUICK SUMMARY:
IFO is in IDLE for PLANNED ENGINEERING
A look at today's activities (extends to Fri)