TITLE: 12/26 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 25mph Gusts, 16mph 3min avg
Primary useism: 0.05 μm/s
Secondary useism: 0.90 μm/s
QUICK SUMMARY:
Cameras:
Everything looks fine currently.
Lights were left on in the Woodshop & OSB 163, ifsomeone is heading to site.
SEI: Looks as I'd expect it to look. HAM7 is red because it's had people in and out of it since before the break. I imagine leaving that watchdog tripped is fine.
SUS: Seems to be looking reasonable as well considering the OPO and Jack work that was being done before break.
PSL Status:
Laser Status:
NPRO output power is 1.84W
AMP1 output power is 70.51W
AMP2 output power is 139.4W
NPRO watchdog is GREEN
AMP1 watchdog is GREEN
AMP2 watchdog is GREEN
PDWD watchdog is GREEN
PMC:
It has been locked 16 days, 17 hr 48 minutes
Reflected power = 25.41W
Transmitted power = 106.2W
PowerSum = 131.6W
FSS:
It has been locked for 2 days 23 hr and 15 min
TPD[V] = 0.5254V
ISS:
The diffracted power is around 3.7%
Last saturation event was 2 days 22 hours and 25 minutes ago
Possible Issues:
PMC reflected power is high
VEA Temps: