Reports until 07:29, Monday 05 January 2026
H1 General (CDS)
ryan.crouch@LIGO.ORG - posted 07:29, Monday 05 January 2026 - last comment - 08:39, Monday 05 January 2026(88679)
OPS Monday Day shift start

TITLE: 01/05 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 12mph Gusts, 6mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.31 μm/s 
QUICK SUMMARY:

Comments related to this report
david.barker@LIGO.ORG - 08:39, Monday 05 January 2026 (88681)

Erik, Dave:

All workstations and NUCs which had been powered down during the break have been powered back up.

1. picket fence is working again.

2. I have stopped running nuc_dummy_ioc.py which was temporarily serving dummy NUC EPICS channels to the EDC

3. cds_report has been reverted to the pre-break version (it had been expecting WS to be down and NUC reported had been removed)